CASE HISTORY: 12


Account:
Tooling and Stamping Plant, KY

Metalforming Operation:
Progressive die operation, fine blanking and piercing for console bracket manufacturing. Fluid sprayed at beginning of progressive dies.

Product:
OAKFORM 7250 at 6%

Tooling Material:
D2 Tool Steel

Workpiece Material and Thickness:
Cold Rolled Steel

Previous Fluid and Tool Life:
Competitor’s heavy duty soluble oil @ 15%.

 

RESULTS
  • Increased part quality.
  • Increased cleanliness.
  • Reduced fluid usage.
  • Good corrosion control